• About Us
  • Our Commitment
  • List of Services
  • Instrumentation
  • Survey
  • Vibration Monitor Rentals
  • AMTS Rental
  • Projects
  • OSHA Training
  • Contact Us
  • Careers
Menu

Vibranalysis, Inc.

79 Alexander Ave. 6th Floor
Bronx, NY, 10454
(718)601-7343
NYC, New York State, Connecticut, New Jersey Vibration and Construction Monitoring

​You're Custom Text Here

Vibranalysis, Inc.

  • About
    • About Us
    • Our Commitment
  • Services
    • List of Services
    • Instrumentation
    • Survey
  • Rentals
    • Vibration Monitor Rentals
    • AMTS Rental
  • Projects
    • Chickamauga Lock Replacement
    • Mill Basin Bridge
    • Lighthouse Point Staten Island
    • Greenpoint Landing
    • Bay Park STP
    • Downtown Montauk Stabilization Project
    • WWTP North River (NYC)
    • Pelham Line MTA 5 Station Rehabilitation
    • World Trade Center/ Freedom Tower
    • Highline Project
    • Lincoln Center
    • JFK Airport
    • Brooklyn Bridge Park
    • Ridge Hill, Yonkers, NY
    • St. Patricks Cathedral
    • Museum Of Natural History
    • Empire Theatre
    • Giants Staduim
    • Whitestone Bridge
    • NYS DOT MSE Walls
    • 42 Trinity
    • 1 Clinton Street
    • LIRR Third Track Expansion
    • TSX Broadway X Palace Theater
    • Queens Plaza Park
    • Graduate Hotel Roosevelt Island
    • Clifton Car Repair Shop
    • 85 Jay Street
    • 810 Fulton Street
    • The Korean Cultural Center
  • OSHA Training
  • Contact
    • Contact Us
    • Careers

Mill Basin Bridge

Vibranalysis successfully installed and monitored In-Place Inclinometers to track lateral deformation during placement of 30’+ MSE (mechanically stabilized earth) ramps for the new Mill Basin Bridge. The data collected in combination with manual settlement plate readings allowed the contractor to compensate for elevation drop caused by loading of the original grade.

Mill Basin Bridge

Vibranalysis successfully installed and monitored In-Place Inclinometers to track lateral deformation during placement of 30’+ MSE (mechanically stabilized earth) ramps for the new Mill Basin Bridge. The data collected in combination with manual settlement plate readings allowed the contractor to compensate for elevation drop caused by loading of the original grade.

MillBasinRendering.png

79 Alexander Avenue, 6th Floor, Bronx, NY 10454
5743 Corsa avenue, suite 124, Westlake Village, CA 91362
550 N Main st, southington, ct 06489
Phone: (718) 601-7343